Excavation SErvices

Hydro vac/Pressure Digging

 Checkmate traffic strategies has excavated  piling holes over 50’ deep and has dug as many as 1,000  piling holes at a single facility. 

 Checkmate Traffic Strategies Hydrovac Crews  will typically dig between 10 and 30 pole holes  (24” diameter x 7’ deep) per day, depending on  soil conditions.  